Day-to-Day Track Maintenance Part II: Switches & Crossings

Day-to-Day Track Maintenance Part II: Switches & Crossings

""
  • 1952
  • 0 hr 21 min
  •  0  (0)
  •   Released

Continuing the study of the normal tasks performed by a permanent-way gang, this film deals with the maintenance of switches, common crossings and obtuse crossings. These are the fundamental units from which all track layouts, however complicated are built up.

Day-to-Day Track Maintenance Part II: Switches & Crossings
Description
Continuing the study of the normal tasks performed by a permanent-way gang, this film deals with the maintenance of switches, common crossings and obtuse crossings. These are the fundamental units from which all track layouts, however complicated are built up.
  • Release Date
    1952
  • Runtime
    0 hr 21 min
  • Language
    en
  • Rating
    0  (0)