Stars Over the River Drin

Stars Over the River Drin

""
  • 1978
  • 1 hr 9 min
  •  0  (0)
  •   Released

After the foreign specialists leave, engineer Lulëzim is left in charge of building the Fierza Hydroelectric Power Station.

Stars Over the River Drin
Description
After the foreign specialists leave, engineer Lulëzim is left in charge of building the Fierza Hydroelectric Power Station.
  • Release Date
    1978
  • Runtime
    1 hr 9 min
  • Language
    sq
  • Rating
    0  (0)